Home / Blog / Construction Bookkeeping in Québec: CCQ, RBQ, the T5018 and the Taxes Contractors Miss

Construction Bookkeeping in Québec: CCQ, RBQ, the T5018 and the Taxes Contractors Miss

Updated 2026-11-12

Short answer A Québec contractor has four record-keeping fronts most trades underestimate. You generally need an RBQ licence to bid and work, and you register with the CCQ once you do construction work governed by Act R-20. If more than 50% of your business income is construction and you pay a Canadian subcontractor more than $500 (excluding GST/HST) in the year, you must file a T5018 slip for them — due 6 months after your reporting period ends. GST/QST on a holdback generally isn’t payable until the holdback is released, which is easy to over-remit. And misclassifying a worker as a subcontractor is the single most expensive mistake in the trade.

Construction is one of the most heavily reported industries in Canada, and Québec adds a second layer on top of the federal one. A general contractor we work with came to us after a Revenu Québec letter about subcontractor reporting — the books were fine for income tax, but nobody had been filing the slip that flags subcontractor payments, and the catch-up spanned two years. Nothing about the work was dishonest; the reporting rules for the trade simply weren’t set up. This guide walks through the four fronts that trip up Québec contractors: licensing and registration (RBQ and CCQ), the T5018 subcontractor slip, GST/QST — especially on holdbacks, and job costing plus the employee-versus-subcontractor question that drives most audits.

Do you need an RBQ licence and CCQ registration?

These are two different bodies with two different jobs, and you often deal with both.

  • RBQ (Régie du bâtiment du Québec) issues the contractor’s licence. In general, you must hold an RBQ licence — as a general or specialized contractor — before you bid on or carry out construction work in Québec. Licences are renewed on a schedule and renewal fees apply. Electrical and some gas work runs through a separate body (the CMEQ/CMMTQ), not the RBQ.
  • CCQ (Commission de la construction du Québec) administers Act R-20, which governs labour relations, training and workforce management on most construction sites. If you do construction work covered by R-20, you register as an employer with the CCQ. Registration ties to your RBQ licence number and your Québec enterprise number (NEQ).

Why a bookkeeper cares: the CCQ asks who keeps your books and produces your reports, so your accounting function is part of your CCQ employer file. And the two numbers — RBQ licence and CCQ registration — have to be consistent with what you put on invoices, bids and tax filings. If you’re just starting, our guide to starting a business in Québec covers the NEQ and structure choices that come first.

The T5018: the slip that catches most contractors

The T5018, Statement of Contract Payments, exists specifically to flag payments in the construction sector and reduce the underground economy. It is the single most-missed filing in the trade, and the rules are precise.

Do you have to file one?

You must issue a T5018 (or an equivalent listing) when all three of the following are true:

  • More than 50% of your business income is from construction activities. If construction is not your primary income — say you’re a gas company that happens to build pipelines — you report subcontractor fees on a T4A instead, not a T5018.
  • You paid a subcontractor who is a resident of Canada for construction services (performed inside or outside Canada). Payments to non-resident subcontractors go on a T4A-NR, never a T5018.
  • Total payments to that subcontractor in the period were more than $500, not including GST/HST.

“Construction activities” is broad — the CRA’s own list runs from framing, roofing, drywall, concrete and excavation to plumbing, electrical, HVAC, paving and demolition. Payments for goods only are not reported; it’s payments for services (or services plus materials) that count. If a person works for you both as an employee and as a subcontractor, the employment pay goes on a T4 and the subcontract work on a T5018.

The GST/HST trap in Box 22

This is where good books go wrong. The $500 reporting threshold is tested excluding GST/HST — but the amount you actually report in Box 22 includes GST/HST and PST/QST. So you test the net, then report the gross. Getting those backwards either triggers slips you didn’t owe or understates the ones you did.

When it’s due

You pick your reporting period — the calendar year or your fiscal period — and the T5018 return is due 6 months after the end of that period. That’s unlike T4s (end of February); contractors who assume a February deadline file late. Amounts are reported on a paid (cash) basis — the year the payment was made, not when the invoice was dated — and always in Canadian dollars.

QuestionRule
Who filesBusiness with >50% income from construction
Reporting thresholdMore than $500 to a subcontractor in the period, excluding GST/HST
Box 22 amountTotal paid, including GST/HST and QST
Non-resident subcontractorUse T4A-NR instead
BasisCash — the year paid
Deadline6 months after the reporting period ends
Electronic filingRequired once you file more than 5 information returns of a type

What happens if you don’t file

Late slips carry penalties from $100 up the CRA’s per-slip scale. More seriously, the CRA singles out the construction sector: a contractor who plans with subcontractors to conceal payments can face criminal prosecution and penalties of up to 200% of the tax avoided. If you have missed years, file them — our catch-up and late-filing guide explains how, and our contractor bookkeeping service runs the T5018s with your year-end so they’re never late again.

CCQ reporting and the records you must keep

If you employ workers on R-20 construction, the CCQ expects ongoing reporting, and your books feed it:

  • A monthly report of employees’ hours worked.
  • A daily activity register and payroll records, kept for the retention period Revenu Québec requires (generally six years).
  • Deductions and contributions handled through the CCQ for construction employees — which is why construction payroll is not the same as ordinary Québec payroll (RL-1, CNESST and QPIP still apply, but the CCQ layer sits on top).

Construction payroll is specialized enough that it’s worth keeping separate from your general books. Our payroll service and the Québec payroll checklist cover the RL-1/T4, CNESST and source-deduction side; the CCQ monthly report sits alongside it.

GST/QST for contractors — and the holdback timing rule

Like any Québec business, you generally must register for GST and QST once your taxable sales pass $30,000 over four consecutive calendar quarters, and in construction you’ll almost always cross it. Revenu Québec administers both taxes. Our free GST/QST calculator and the GST/QST guide cover registration and filing.

The piece specific to construction is holdbacks. On most construction contracts, the customer retains a holdback (often around 10%) until the work is accepted. Under the federal rules, GST/HST on a holdback generally is not payable until the holdback is paid or the holdback period under the contract or the applicable lien legislation expires, whichever comes first — and the QST follows the same logic. In plain terms: you usually don’t remit the tax on the retained 10% until you actually receive it. Contractors who invoice the tax on the full amount up front end up financing Revenu Québec out of their own cash flow. Tracking holdbacks receivable and payable separately is one of the highest-value things a construction bookkeeper does.

Job costing, progress billing and holdbacks on the books

General bookkeeping tells you whether the company made money. Job costing tells you whether the job made money — and in construction, that’s the number that matters. A proper construction set-up tracks:

  • Cost by job and phase — labour, materials, subcontractors and equipment coded to each project, so you can compare actual cost to the estimate while there’s still time to act.
  • Progress billing and work-in-progress — revenue recognized as the job advances, not just when you invoice.
  • Holdbacks receivable and payable — the money retained from you, and the money you retain from your subcontractors, tracked separately from ordinary A/R and A/P (and remember the GST/QST timing above).
  • Subcontractor files — each sub’s business number, GST/QST registration status, RBQ licence and CCQ standing, and payment history, so your T5018s are a byproduct of the books rather than a year-end scramble.

Employee or subcontractor? The most expensive question in the trade

Calling a worker a “subcontractor” doesn’t make them one. If the relationship is really employment, the CRA and Revenu Québec can reassess years of unremitted source deductions, QPP/QPIP and CNESST — plus interest and penalties — and the CCQ has its own competency-certificate rules for who may perform construction trades on a site.

The test looks past the label to the substance of the relationship: control over how and when the work is done, who provides the tools and equipment, the worker’s chance of profit and risk of loss, and how integrated they are into your business. One important Québec wrinkle: the province applies its own Civil Code analysis, so a worker can be treated differently for Québec purposes than for federal purposes, and a written “subcontract” won’t save a relationship that functions like employment. If you’re not sure, get the classification reviewed before the worker starts, not after an audit — our employee-vs-contractor guide goes deeper, and we review classifications as part of onboarding.

How we set up contractors

We build construction clients on a job-costed ledger from day one: subcontractor files that generate T5018s automatically, holdbacks tracked on both sides with the GST/QST timing handled, CCQ-ready payroll, and GST/QST and year-end filed on schedule. If your books are behind or a Revenu Québec letter already arrived, we catch up quietly and set up the reporting so it stays clean. See contractor bookkeeping in Montréal or talk to us — no obligation. This guide is general information; your situation deserves a direct conversation.

Frequently asked questions

Do I have to file a T5018 for my subcontractors?

Yes, if more than 50% of your business income is from construction, your subcontractor is a resident of Canada, and you paid them more than $500 (excluding GST/HST) for construction services in the period. Non-residents go on a T4A-NR, and if construction isn’t your primary income you use a T4A instead.

When is the T5018 due?

Six months after the end of your reporting period, which can be the calendar year or your fiscal period. That’s different from T4s, which are due at the end of February, so a lot of contractors file the T5018 late by assuming the wrong date.

Does the $500 T5018 threshold include GST/QST?

No — the $500 test is measured excluding GST/HST. But once you have to file, the amount you report in Box 22 does include GST/HST and QST. You test the net and report the gross.

When do I charge GST/QST on a holdback?

The tax on a construction holdback generally isn’t payable until the holdback is released, or the holdback period under the contract or lien law ends, whichever comes first. Remitting the tax on the retained amount before you receive it ties up your cash with Revenu Québec.

What’s the difference between the RBQ and the CCQ?

The RBQ issues your contractor’s licence — you generally need it to bid and work. The CCQ administers Act R-20 (labour relations, training, the workforce) and is who you register with as an employer and send monthly hour reports to. Most contractors deal with both.

Can I just pay my workers as subcontractors?

Only if they genuinely are subcontractors. If the relationship is really employment — you control the work, supply the tools, they bear no real risk — the CRA, Revenu Québec and the CCQ can reassess years of source deductions, QPP/QPIP and CNESST with interest and penalties. Québec also applies its own Civil Code test, so get it reviewed before they start.

Why do contractors need job costing?

Because company-level profit hides which jobs win and which bleed. Job costing codes labour, materials, subs and equipment to each project so you can compare actual cost to the estimate in time to act — and it makes subcontractor files, holdbacks and T5018s fall out of the books automatically.

How much does construction bookkeeping cost?

Our plans start at $350/month and scale with volume — number of jobs, subcontractors, employees on payroll and whether we also handle CCQ reporting, GST/QST and year-end. We quote up front after a short call about your projects.

Sources